| Main
Menu |
Agricultural
|
Equestrian
|
Fencing
|
Latest
Products |
IAE
Riverside Works
Macclesfield Road
Leek, Staffordshire
ST13 8LB
Agri
Sales
Tel: +44(0) 1538 399 200
Fax: +44(0)1538 373 055 |
Distribution
IAE - Longton S-O-T
01782 339 320
|
|
|
|
| |
| PHASE
2 |
Work
begins on phase two adding an extra 65,000 sq ft of ultra modern
manufacturing facility on IAE’s purpose built 26 acres site.
The new phase will incorporate new high tech manufacturing techniques
consisting of:
Full automatic tube laser cutting machines
Automatic
sawing and de-buring lines
CNC
controlled bending machines
CNC
punching lines
5
Robotic welding cells
Due to all these modern manufacturing techniques IAE have seen
the need to incorporate a full covered steel storage building
which Is capable of holding 2500 tonnes of raw material all
transported throughout the building with eight 5 tonne remote
controlled demag Cranes.
IAE main objective for phase two is increase manufacturing capability
with a overall goal of increasing customer supply and service.
See Images From the Site During
Phase 2
|
|
|